How permit milestones and inspection gates keep your build legal

Permits and inspections become real timeline steps — the build parks at each inspection hold point, and the permit packet exports as a PDF.

  1. 1

    Permits join the timeline

    An apply-for-permits milestone lands before construction, carrying the document checklist.

  2. 2

    Inspections sit at the right seams

    Each inspection lands where it belongs — like the gas-removal check before the wall is closed up — placed automatically from your permit report.

  3. 3

    The gate parks the build

    While an inspection is due, the project shows blocked so you never cover work early.

  4. 4

    Pass and move on

    Mark the inspection done and the timeline unblocks and reschedules automatically.

  5. 5

    Export the PDF packet

    Download the permit packet — checklist, inspections, fees, and sources — ready for the permit office.

Start your own project

Bring your idea — the agent designs, prices, and schedules it with you.

See plans