Permits and inspections become real timeline steps — the build parks at each inspection hold point, and the permit packet exports as a PDF.
An apply-for-permits milestone lands before construction, carrying the document checklist.
Each inspection lands where it belongs — like the gas-removal check before the wall is closed up — placed automatically from your permit report.
While an inspection is due, the project shows blocked so you never cover work early.
Mark the inspection done and the timeline unblocks and reschedules automatically.
Download the permit packet — checklist, inspections, fees, and sources — ready for the permit office.
Bring your idea — the agent designs, prices, and schedules it with you.
See plans